Pinnacle Heavy Civil delivers mission-critical civil infrastructure for hyperscale data centers, high-voltage transmission, battery storage, and renewable generation – with the precision, speed, and certainty the AI era demands.

Powering the AI Revolution – One Foundation at a Time

The AI Power Gap

The Hard Truth the Industry Is Learning AI doesn’t have a chip shortage — it has a power shortage.

  • Frontier AI compute demand is growing 4–5× per year

  • Chip efficiency only improves ~2× every 2 years

  • GPUs become obsolete in 2–4 years

  • Grid upgrades and transmission take 7–10+ years

Result: Hyperscalers already own billions in GPUs they literally cannot power. Arizona is one of the most constrained — and most lucrative — battlegrounds.

Construction site with workers, heavy machinery, and large pipes being installed. Steel frameworks of two buildings are in the background with cranes overhead.

We Solve the “Time-to-Power” Problem Pinnacle self-performs the mission-critical civil scope hyperscalers and utilities can’t wait for:

  • Megawatt-scale trenching & duct banks (144-way conduit standard)

  • 69 kV / 138 kV / 500 kV transmission corridor civil prep

  • Substation grading, switchyard pads, and access

  • Hyperscale data-center building pads & mass grading

  • High-capacity cooling water lines & retention systems

  • Utility coordination with APS, SRP, EPCOR, and municipalities

We collapse timelines others can’t.

Arizona Opportunity

Why Arizona Is the Hottest AI Power Market in America

  • 1.8+ GW of announced data-center / AI load in queue

  • $12–18 billion in AI-related construction expected by 2030

  • APS + SRP forecasting capacity deficits through 2029

  • Buckeye, Mesa, Queen Creek, Casa Grande = the new “AI Triangle”

The bottleneck isn’t land — it’s megawatts. Pinnacle turns constrained parcels into power-ready campuses 12–24 months faster than the market.

Why Pinnacle Wins

The Only Arizona Heavy-Civil Firm Built for This Moment

  • Arizona-native leadership with decades of APS/SRP/EPCOR relationships

  • Proven ability to accelerate power delivery by 12–24 months

  • Self-perform 95 % of scope — no subcontractor finger-pointing

  • Specialized “AI Infrastructure Rapid Deployment” division launching Q1 2026