Pinnacle Heavy Civil delivers mission-critical civil infrastructure for hyperscale data centers, high-voltage transmission, battery storage, and renewable generation – with the precision, speed, and certainty the AI era demands.
Powering the AI Revolution – One Foundation at a Time
The AI Power Gap
The Hard Truth the Industry Is Learning AI doesn’t have a chip shortage — it has a power shortage.
Frontier AI compute demand is growing 4–5× per year
Chip efficiency only improves ~2× every 2 years
GPUs become obsolete in 2–4 years
Grid upgrades and transmission take 7–10+ years
Result: Hyperscalers already own billions in GPUs they literally cannot power. Arizona is one of the most constrained — and most lucrative — battlegrounds.
We Solve the “Time-to-Power” Problem Pinnacle self-performs the mission-critical civil scope hyperscalers and utilities can’t wait for:
Megawatt-scale trenching & duct banks (144-way conduit standard)
69 kV / 138 kV / 500 kV transmission corridor civil prep
Substation grading, switchyard pads, and access
Hyperscale data-center building pads & mass grading
High-capacity cooling water lines & retention systems
Utility coordination with APS, SRP, EPCOR, and municipalities
We collapse timelines others can’t.
Arizona Opportunity
Why Arizona Is the Hottest AI Power Market in America
1.8+ GW of announced data-center / AI load in queue
$12–18 billion in AI-related construction expected by 2030
APS + SRP forecasting capacity deficits through 2029
Buckeye, Mesa, Queen Creek, Casa Grande = the new “AI Triangle”
The bottleneck isn’t land — it’s megawatts. Pinnacle turns constrained parcels into power-ready campuses 12–24 months faster than the market.
Why Pinnacle Wins
The Only Arizona Heavy-Civil Firm Built for This Moment
Arizona-native leadership with decades of APS/SRP/EPCOR relationships
Proven ability to accelerate power delivery by 12–24 months
Self-perform 95 % of scope — no subcontractor finger-pointing
Specialized “AI Infrastructure Rapid Deployment” division launching Q1 2026