Mission-Critical Delivery

The "Speed-to-Market" Standard

Powering the AI Revolution. Rapid-Deployment Civil Infrastructure for Hyperscale & Colocation Data Centers.

The AI Power Gap

AI doesn’t have a chip shortage — it has a power shortage. We solve the "Time-to-Power" bottleneck.

4–5× Annual Compute Demand Growth
2–4 Yrs GPU Obsolescence Lifecycle
10+ Yrs Grid Upgrade Lead Time
Deficit Forecasted Capacity through 2029

The Arizona "AI Triangle"

1.8+ GW of announced AI load is in queue. The bottleneck isn’t land — it’s megawatts. We turn parcels into power-ready campuses 12–24 months faster than the market.

  • BUCKEYE
  • MESA
  • QUEEN CREEK
  • CASA GRANDE
144-WAY STANDARD

Megawatt-Scale Trenching

Expert installation of massive duct banks and high-capacity conduit networks to sustain GPU cooling and power loads.

500 KV READY

Transmission & Switchyards

Civil prep for 69 kV to 500 kV transmission corridors. Substation grading and precision switchyard pads.

LIQUID COOLING

High-Capacity Wet Utilities

Installation of mission-critical chilled water lines and retention systems engineered for hyperscale thermal loads.

LASER ACCURATE

Hyperscale Building Pads

Mass grading and structural fill delivery for 100+ acre greenfield campuses with zero-settlement tolerance.

The Only Firm Built for This Moment

95% Self-Performed Scope
12-24mo Schedule Acceleration
Q1 2026 AI Rapid Deployment Division

Arizona-native leadership with decades of APS/SRP/EPCOR relationships. We collapse timelines that others can't.