The "Speed-to-Market" Standard
Powering the AI Revolution. Rapid-Deployment Civil Infrastructure for Hyperscale & Colocation Data Centers.
The AI Power Gap
AI doesn’t have a chip shortage — it has a power shortage. We solve the "Time-to-Power" bottleneck.
The Arizona "AI Triangle"
1.8+ GW of announced AI load is in queue. The bottleneck isn’t land — it’s megawatts. We turn parcels into power-ready campuses 12–24 months faster than the market.
- BUCKEYE
- MESA
- QUEEN CREEK
- CASA GRANDE
Megawatt-Scale Trenching
Expert installation of massive duct banks and high-capacity conduit networks to sustain GPU cooling and power loads.
Transmission & Switchyards
Civil prep for 69 kV to 500 kV transmission corridors. Substation grading and precision switchyard pads.
High-Capacity Wet Utilities
Installation of mission-critical chilled water lines and retention systems engineered for hyperscale thermal loads.
Hyperscale Building Pads
Mass grading and structural fill delivery for 100+ acre greenfield campuses with zero-settlement tolerance.